Case Study – Monache High School Parking Lot

Click here to open this file: Case Study – Monache High School Parking Lot
Website Link: http://cncement.org/wp-content/uploads/2014/05/CNCA_Monache-High-School-Parking-Lot-profile.pdf

Porterville Unified School District needed to replace failed asphalt parking lot. The old pavement was ground and reused as base for the new concrete surface. The need to reduce maintenance costs coupled with limited access after solar panels were installed made concrete the clear choice.

Applies to: Parking Lots
Case Study